
A frantic race against the clock (and the weather) 🥶❄️
Your rating
Reactions
Channels and socials
Second Channel: @shannonmakessomethingelse HOUSE RENO PLAYLIST: youtube.com Patreon (monthly support): patreon.com Ko-Fi (one time tips & online store): ko-fi.com The 'Gram: @ShannonMakes Facebook: @ShannonMakesYT -------------------------------------------- OTHER WAYS TO SUPPORT THE HOUSE PROJECT Sage Restoration gift card: I will be frequenting this seller of historically appropriate supplies, materials & tools for things such as properly repointing my basement with lime-based mortar, and I just found out that they offer electronic gift cards!! → sagerestoration.com → my email address is makingseamsmeet @gmail.com CANADIAN Home Depot gift card: → homedepot-ca.cashstar.com → select "Digital Card" and my email address is makingseamsmeet @gmail.com AMAZON WISH LIST: Canadian Version: amazon.ca
My email, if you want to do a gift certificate instead: makingseamsmeet @gmail.com →Amazon alternative: thegiftcardshop.com →Amazon gift card: go to amazon.com and type in "Amazon.com eGift Card" Please note that while I know it's a pain in the butt to create an Amazon.ca account, it is infinitely more useful to me to have a gift card that I can use on the Canadian amazon account, because I am very limited in the size, weight, and contents of things I can buy on Amazon.com and physically carry over the border HOUSE RENO PLAYLIST: youtube.com
AI Overview
After a frustrating day of delays and missing supplies, Shannon and Phil turn to opening the back wall of their old house. They need access to the lower part of the wall so they can add insulation and block drafts before winter. The work is urgent because they have to leave for a winter contract in a few days. The outdoor temperature is about 4°C, and the cold makes filming difficult as batteries drain and fingers become less nimble. Shannon joins Phil outside to help remove siding and keep the project moving. Their plan is to focus on the lower wall rather than strip the entire exterior. The exposed wall reveals original wood siding that had been buried under soil, along with layers of later siding and protective material. Phil tries to preserve the old boards, but many are brittle or damaged after more than a century in place. The couple also finds that the original siding has a distinctive, relatively large profile, so replacement boards may need to be made by a local lumber mill. They label the exterior sheathing before removing it in hopes of reinstalling it in its original positions. During a time-lapse, more than 45 minutes of work is condensed into a short sequence, while gusty wind shakes the tripod. The footage also shows old paper behind the siding, which Shannon compares to an early form of house wrap. With the wall open, they inspect the floor framing and sill plate, finding a section that is thin, uneven, and supported by numerous shims. A diagonal brace has been cut and no longer reaches the ground, while past repairs to the sill plate include a poor joint. They postpone major structural work until spring, when they expect to replace the sill plate. For the immediate winter preparation, Shannon measures and cuts insulation to fit the uneven wall cavities, which contain varying amounts of old blown-in material. She also applies flashing tape at gaps between the floor and wall to reduce drafts temporarily. Phil works beneath the house on a deteriorated area affected by an old vent pipe. The pipe-related damage includes a badly affected section of structure and an abandoned vent, while another vent appears to remain in use. Phil removes sections of old lead pipe and discusses cleaning, supporting, and capping the damaged area, with more complete repairs planned for later. Shannon helps by passing tools and cutting boards so Phil can stay in the confined space beneath the house. The insulation work is presented as a practical, temporary step to make the house warmer until larger repairs can be done. The episode shows both the complications of working on a historic house and the couple’s effort to salvage original materials where practical. Despite the cold, wind, and tight schedule, they make progress on insulating the back wall and addressing its most immediate draft paths.
Topics · people & blogs · home renovation · do-it-yourself
Questions answered
- Why are Shannon and Phil opening the back wall of their old house?
- They need access to the lower wall to add insulation and block drafts before winter.
- How cold was it while the couple worked outside?
- The outdoor temperature was about 4°C.
- Why is the original wood siding difficult to save?
- The boards are more than a century old, brittle, and damaged from being buried and exposed to moisture.
- What makes matching replacement siding challenging?
- The original boards have a distinctive, relatively large profile that may not be available at ordinary lumber yards.
- What structural problems did the opened wall reveal?
- The sill plate is thin and uneven, has multiple shims and poor repairs, and a diagonal brace no longer reaches the ground.
- How are Shannon and Phil handling the draft and damaged framing before larger repairs?
- Shannon is fitting insulation into the wall cavities and using flashing tape as a temporary air barrier, while Phil works on the damaged area beneath the house. More extensive structural repairs are planned for spring.







